Opus
Ideas & decisions
Decision simulator
Before approving something, ask the simulator. It runs counterfactual analysis over your historical decision→outcome pairs and returns a confidence-bounded projection.
Scenario
Model trained on 214 decisions with 96 measured outcomes
“What happens if we delay SULTAN v0.7 by 2 months?”
timeframe: 6 monthsconfidence: high214 similar patterns
Projected outcomes
Revenue impact
MRR at end of Q4
−$36k
Cash flow (Q4)
within safety margin
−$18k
Runway change
still >12 months
−0.4 mo
AI health index
small dip
−4pts
Key drivers
Why the simulator says what it says
- Engineering weeks delayed8
- Customer commit slip2 clients
- Feature parity gap−12%
- Team moraleneutral
Historical basis
Prior model-launch delays (n=12) averaged a 3.8% MRR drag and a 0.6-month cash-flow dip. The larger the delay, the worse. Your team has recovered from delays smaller than 6 weeks; a 2-month slip is at the outer edge.
Upside case
10th percentile
Team uses the 2 months to bake in reasoning improvements; v0.7 lands with MMLU 65+, converting 2 prospects who were skeptical of v0.65 quality. Net revenue actually up.
Downside case
10th percentile
Competitor releases a comparable open model; SULTAN's window narrows. −$60k MRR, needs bridge decision on positioning.
Recommendation
Don't delay. Ship v0.7 as-planned; land reasoning improvements in v0.8.